cleanroom design & construction from MRC Systems Unique Products for Controlled Environments
Home Login About Us Products & Services Gallery Case Studies Contact
     
cleanroom design & construction from MRC Systems
 
 
Projects
 
PROJECTS DETAILS YEAR
3M Health Care (UK) New Wound Dressing Facility 1989
Abbott Laboratories (UK) Packaging Facility 1995
Abbott Laboratories (Ireland) 700mē Drug Facility 2002
Abbott Laboratories (Ireland) Tableting Facility 2005
(Case Study)
Al Kindi (Jordan) Design study of IV solution and insulin facility 2001
Al Kindi (Jordan) New cleanrooms for IV and insulin 2004
Al Kindi (Jordan) Expansion of cleanrooms for IV and insulin 2005
Allergan (Ireland) Sterile Filling Suite 1995
Arabio (Saudi) Aseptic Filling Cleanrooms 2006
API
(Advanced Pharmaceuticals)
(Jordan)
Cytoxics Injectables Line 2004
Astra Zeneca (UK) New clean and sterile manufacturing area 1983/84
  New aseptic areas for central controlled laboratories 1984
  New tableting facility 1984/85
  Design and construction of dry products and liquids dispensary 1989/90
  Automatic liquid packaging suite 1989/90
Astra Zeneca (India) Containment research facility 2002
Aventis, Dagenham (UK) Packaging Facility 2001
Axis Biochemicals ASA (Norway) New Production Facility 1997
Banha Electronics (Egypt) Installation of panels and accessories 2006
Biocon (India) New cleanroom 2003
Biocon (India) Production of laboratory area 2004
Biocon (India) Cleanroom for insulin production 2007
Biora (Sweden) New Research Facility 1988
BioGeneric Pharma (Egypt) Facility for pre-filled syringes and lyopholised vials 2007
Biotechna (Lithuania) Design and Construction of Sterile Pilot Plant Facility 2000
Biovision (Belgium) Sterile facility for the manufacture of ophthalmic product 2002
Biovision (Belgium) Facility for sterile contact lens care solutions 2005
Biovitrum (Sweden) Cleanroom modification 2005
Birzeit Pharma (Palestine) Sterile Filling Facility 2006
Birzeit Pharma (Palestine) Cleanroom 2008
Boots Pharmaceutical (UK) Two Clean Room Suites 1990
BNFL (UK) Drum Filling Area 1989
Cadilla Zydus (India) Sterile filling facility 2001
Cadilla Zydus (India) Construction of a formulation facility and an injectables facility 2006
Cadilla Zydus (India) Vaccine Facility 2007
Cenes (Scotland) New Class 10,000 Hydrogel Facility 1998
Central Veterinary Labs (UK) New Microbiological Containment Suite 1988/89
Chiesi Farmaceutici SPA (Italy) Primary Process Plant and New Laboratory 1997
Chiron Corporation (USA) Sterile Filling Area 1988/89
Cipla (India) Cleanrooms for Liquid Products and Dry Products 2001
Cipla (India) Modifications to existing cleanrooms 2003
Cipla (India) Design and construction of new cleanroom facility 2005
Commercial League (Bulgaria) Design and Construction of Rocephine Production Facility 2000
DEEF Pharmaceuticals (Saudi Arabia) Production of cleanrooms for general pharmaceutical products 2004
DEEF Pharmaceuticals (Saudi Arabia) Cleanroom for general pharmaceutical products 2006
Eupharma (India) Cephalosporin Production Suite 1995
El Kendi (Algeria) Cleanroom facilities for the production of solid dosage products 2006
El Kendi (Algeria) Design and manufacture of cleanroom 2008
Farma, aps (Portugal) Supply and installation of a cleanroom for the manufacture of solid dosage form products 2006
Fujisawa (Ireland) Sterile Production Suite 1992
G D Searle & Co Ltd (UK) Powder weight booth area 1983
  New clean chemical manufacturing plant 1983/84
  High containment packaging facility 1992
GE Healthcare (Holland) MRC 1200 cleanroom sterile facility & modifications 2002/2003
GE Healthcare (Norway) New sterile manufacturing facility 1987
GE Healthcare (UK) Sterile manufacturing area for lyophilised products 1989
GlaxoSmithKline (USA) Sterile Suite

1990

GlaxoSmithKline (UK) 5,000 sq ft New Vaccine Plant, Worthing

1981

(Case Study) Clean and sterile area in new Manufacturing Plant at Crawley

1982/83

  Extended

1983

  Total clean and sterile encapsulation of bulk sterile filling area for Penicillin at Worthing

1984

  Two Sterile Rooms, Dartford

1984

  Sterile Filling Area, Dartford

1984

  Sterile Manufacturing Area, Dartford 1984
  Tissue culture Suite 1984
  Research pilot plant for sterile products at Walton Oaks 1985
  Extension to Sterile Suite – Crawley 1985
  Pilot plant laboratory at Worthing 1989
  Sterile Manufacturing Suite, Dartford 1991
  CMU facility 1994
  Tank steaming room 1995
  Extension of Sterile Suite 1996
  Sterile and Dry products facility, Harlow 1996
  Turnkey Project, Tank Steaming Room 1997
  Upgrade of Sterile Facility and Ancillary Areas 1997
GSK (UK) Dismantling old cleanroom and replacing with new cleanroom 2005
Hikma Tableting facility 1996
Hikma (Portugal) Sterile Ampoule Filling Facility 2002
Hikma (Portugal) Site expansion 2005
Hikma New manufacturing facilities 2005
  New sterile area 2006
  MRC 1200 Cleanroom Sterile Facility 2007
  Solid dosage form facility 2007
  Penicillin facility 2008
Imperial College (UK) Supply and installation of laboratory furniture. 2005
Ipsen Biopharm (UK) Cleanroom Facility 1996
(Case Study) Dysport Filling Suite 1999
  Design and construction of a Plasma Production Facility (Ireland) 2000
  New cleanroom facility 2001
IQE, St Mellons (UK) Class (1) Microelectronic Cleanroom Facility 2002
Ivex Pharmaceutical Ltd (Ireland) Manufacturing Areas for Rommelag Filling 1985/86
Johnson & Johnson (UK) Controlled Environment 1988/89
Jordanian Pharmaceutical
Manufacturing Co (Jordan)
Design and Consultancy Services. New Solid Dosage Manufacturing Facility 1998
Jordanian Pharmaceutical
Manufacturing Co (Jordan)
Dispensary booth installation 2004
Kahira (Egypt)
(Case Study)
Sterile Production Suites 1991
Kemwell (India) Cleanroom installation 2006
Lilly (UK) Special Controlled Production Suites 1983
Lilly (Ireland)
(Case Study)
Explosion Relief Walls 1990
Luwa, China Cleanroom accessoriess 2003
LRC Products (UK) New Clean Room for Glove Packaging 1987/88
MAG Pharma (UAE) Design study for IV solution plant 2007
  IV Facility 2008
Medeco (Abu Dhabi) New cleanroom installation 2005
Medical Union Pharmaceutical (Egypt)
Sterile Production Suite 1995
(Case Study) Sterile Cleanroom 1999
Medicorp (India) Detailed Design of Tableting Facility 2000
Medochemie (Cyprus) New Tableting Facility 1999
  Sterile Facility for Injectable Products 1998
Merck Sharp & Dohme (UK) Liquids sterile filling area 1981/82
  Containment facility 1990
  Compression rooms 1991
Mobedco (Jordan) Cleanroom for the production of veterinary products 2006
Monocarb (Sweden) New manufacturing facility for Monoclonal 1987
  Antibodies upgrade (above facility) 1995
Moorfields Eye Hospital (UK) New Pharmacy Manufacturing Unit for Opthalmic Products 2000
MFMS (Saudi Arabia) Cleanrooms for Medical Devices 2006
Nicholas (India) New Tableting Facility 2004
Novartis (UK)

Research Facility Refurbishment

1982

(Case Study)

Powder Weigh Booth Area

1982
 

Refurbishment Dry Products Manufacturing Area

1986/87
 

New Dispensary and Compression Booths

1989/90
  Upgrade of Solids Products Unit 1999
  Modification of Walling System 2005
  Facility for tablet compression 2007
Octapharm (Sweden) Extension to an existing cleanroom facility. 2005
Orchid Chemicals (India) Bulk sterile facility 2002
  Sterile Cleanroom for Injectables 2002
Orchid Chemicals (India) Cleanroom for lyophilized injectables 2004
Orchid Chemicals (India) Low speed line injectable area 2004
Orchid Chemicals (India) Supply and installation of new cleanroom 2006
Orchid Chemicals (India) Sterile facility 2006
Orchid Chemicals (India) Facility for API Production 2007
Orchid Chemicals (India) Cephalosporin facility 2007
Pannon Pharma (Hungary) MRC 1200 cleanroom 2008
Pfizer Inc (USA) Sterile Suite 1990
Pfizer (UK)

New dry products facility at Sandwich, Kent

1982

 

Operating theatre at Sandwich, Kent

1993
 

Sterile R&D facility at Sandwich, Kent

1995
 

New change facility

2000
  Freeze dryer installation and cleanroom modification 2002
Pfizer (USA) Sterile Suite 1990
Pfizer (UK) Modification and upgrades to current cleanrooms, integrating new fixtures and fittings 2006
Pharmacia Upjohn (Sweden)

Sterile manufacturing area

1989

 

Sterile manufacturing suite

1989/90
 

Sterile suite

1993
  Sterile suite 1998
Pharmacia Upjohn (UK)

Design and construction of new potent and sterile drug areas

1983
 

Sterile suite at Crawley site

1992
  Supply of MRC 1500 and ancillaries 1999
Plessey Research (UK) Class 10 Clean Rooms for major new electronic
Research Facility
1984/85
Rafarm (Greece) Encapsulation Suites 2007
Roche (UK) Encapsulation Suites 1991
ROFE (Hungary) Design and construction of MRC 1200 Wall and Ceiling System 2006
Sanofi UK Powder Weigh Booth Area 1983
Schering Plough (Ireland) Sterile Suite Ceilings 1990
Sofap (Tunisia) A Cleanness Suite for the manufacturing of syringes and medical devices 1995
Solopak (Chicago)

Sterile Filling Facilities

1986/87

  Sterile Facility 1994
Southampton University (UK) Microelectronic Research Facility 1991
Stena (Sweden) Filling and Manufacturing Clean Rooms 1983
Sterling (Puerto Rico) New Sterile Facility 1986/87
Surrey Satellite Technology (Turkey) Class 1000 Cleanroom for Satellite research, design, study for secondary liquid and solid manufacturing 2001
Techpool Biopharma (China) Design of cleanroom facilities for lyophilized products 2004
TIB Plastic (Saudia Arabia) New cleanroom for medical device 2003
TRC (Iran) Manufacture of cleanroom for the production of tissue graft products 2006
Unipharma (Syria) Liquid and solid dosage facility 2002
United Pharmaceutical Manufacturing (Jordan) Cleanroom equipment 2008
University College London Containment facility, CAT.3 2002
University College London Design and installation to build a Category III Laboratory 2006
Veterinary Laboratory Agency (UK) To upgrade the air-handling system at Defra in the UK. 2006
Warner Lambert (Ireland) Sterile Suite 1991
Wyeth (Ireland)

Clean room suite baby food production

1992
Wyeth (UK)

Design and construction of manufacturing and research facilities

1983/4 - 1989/90
Wyeth (UK)

Penicillin Packaging Facility

1997
Wyeth (Spain) Sterile production facility 1992
Wyeth (Spain) Modification to include new filling machine 2002
Wyeth (Taiwan) Sterile production facility 1994
Yemen Egyptian Pharma (Yemen) MRC 1200 sterile facility 2007
Yemen Egyptian Pharma (Yemen) Sterile production facility 2007